← Back to products

EMS BuilderEdge energy orchestration platform

Give every energy projectA starting point beyond zero

Equipment brands, site parameters and customer rules change, but validated experience can be retained. Edge-EMS Builder organizes data, calculations and control into configurable strategies, making one delivery the starting point for the next project.

Reusable strategy assets connect commercial and industrial energy storage, solar-storage-charging sites and campus energy systems, with each site adapted through data point mapping and parameters.
Gradually turn project experience into your company’s own strategy assets.
01

Reuse validated core logic when equipment changes

02

Adjust parameters to suit different site requirements

03

Capture strategies as templates to carry project experience forward

01 / What changes

Another energy project. Do you need to rebuild the software again?

The brands of PCS, BMS, meters and charging points change, as do tariffs, capacity and control requirements. Reconnecting devices, rewriting strategies and rebuilding interfaces each time makes it difficult for experience to accumulate as the number of projects grows.

01

Equipment changes. The core logic can stay.

Strategies operate on unified data identifiers. When changing equipment models, first adjust data point mappings and site parameters, then validate the existing decision logic, reducing the need to redevelop from the protocol layer.

02

When requirements change, start with parameters and rules.

Organize calculations, conditions and actions separately, giving capacity, operating periods and control thresholds clear configuration locations. Teams can determine which changes only need configuration adjustments and which require changes to the strategy.

03

This project’s validation becomes the next delivery’s starting point.

Package logic validated on site into templates along with the required data points, parameters and test conditions. New projects start with mapping, configuration and validation, while the company’s own strategy library grows with each delivery.

02 / A better way to work

Apply the same experience to different energy sites.

Strategy assets retain reusable business logic, while each project connects through data point mappings and site parameters. Validation results feed back into the strategy library to inform the next delivery.

Concept illustration
Reusable strategy assets
Commercial and industrial storage
Solar · storage · charging sites
Campus energy

Reusing a template still requires checking device interfaces, protection conditions and on-site test results to confirm that the strategy suits the current project.

03 / Explore the implementation

When adding charging points, what changes and what can you reuse?

The load balancing example organizes device naming, online device scanning and capacity parameters separately. It explains exactly what must change when adding charging points from the same brand, adjusting capacity or introducing another brand. Reuse has explicit conditions and a process you can validate.

Read the charging point load balancing example

JELINA / EMS BUILDER

Take your validated strategies into the next project.

First list existing devices and control objectives. Use the product guide to identify reusable logic, site parameters and the validation needed for the next project.